BEST-IN-CLASS,
PROMINENTLY POSITIONED SUSTAINABLE
LOGISTICS/WAREHOUSE UNIT

INTRODUCING OUR NEW BOXING ARENA
Enfield 73 is prominently positioned on Mollison Avenue, the main arterial route through the well-established Brimsdown Industrial Estate, a prime strategic London logistics location, within immediate proximity of the A10, A406 and M25.
The established estate is home to many reputable occupiers including Amazon, DHL, Coca Cola, and Warburtons to name a few. The site is located in close proximity to Brimsdown train station which connects directly to London Liverpool Street in 22 minutes.
_Cleear%20Blue%20Sky.jpeg)
DISCOVER THE UPGRADED DANCE STUDIO SPACE
-
2.8 miles M25 J25
-
Net Zero Carbon In Operation
-
Highly prominent onto Mollison Avenue
-
Separate HGV Access
-
4.7 miles/15 mins from A406/North Circular
-
Ideally suited for occupiers seeking to service north & south



Enfield 73 is a brand new Grade A, best in class detached warehouse unit.
The unit will comprise first class ESG credentials including PV roof panelling, EV charging points and use of recycled materials in construction.


Enfield 73 is a brand new Grade A, best in class detached warehouse unit.
The unit will comprise first class ESG credentials including BREEAM Excellent, PV roof panelling, EV charging points and use of recycled construction waste.
ESG EXCELLENCE
Enfield 73 is designed to be Net Zero in operation with four single, three double and two van EV chargers. There will be a Green Roof with PV panelling on part, and water harvesting to provide rain gardens, all of which help contribute to the Net Zero target. It is Targeting BREEAM Excellent and an EPC A+.
MEET OUR ESG SPECS



BUILD SCHEDULE
Use this space to promote the business, its products or its services. Help people become familiar with the business and its offerings, creating a sense of connection and trust. Focus on what makes the business unique and how users can benefit from choosing it.
July 2024
Start on Site
July - Aug 2024
Demolition & Earth Works
August 2024
Foundations, Drainage & Services
Sep - Dec 2024
Steels Up, Roof & Cladding
Dec 24 - March 2025
Interior Fit Out
PC
March 2025
_Blue%20Sky_73.jpeg)


